Your plant as it is, not as it was drawn.

We laser-scan your site to the millimetre, model what the job needs, and check every new pipe and beam against the real plant before anything is fabricated. You get drawings that match the site, a view anyone can open in a browser, and a record that stays true after every change.

  • Site measure-up

    Daysnot weeks

    Tape, ladders and sketches, replaced by a scan of the whole area.

  • Point cloud and 360° view

    1 weekfrom capture to your browser

    In your engineers’ hands while the model is still being built.

  • Tie-ins

    100%checked before steel is cut

    New design clashed against the scan, not against old drawings.

Inclined conveyors and a red ore stockpile at an open-pit iron ore mine, with dust in the air and flat-topped hills behind, at dusk
Sishen, Northern Cape

The week you know

The drawing and the plant stopped agreeing years ago.

Three MOCs, two shutdowns and a contractor who never sent the as-builts. Every brownfield job starts by finding out what is really there, and the expensive surprises arrive during the shutdown.

  • Tuesday · 11:20

    The drawing says 4.2 m. The tape says 3.9 m.

    The spool is already fabricated, galvanised and on site. The fitters are standing at the tie-in with a cut-and-weld problem and twelve hours left in the window.

    What it costsField rework in the most expensive hours of the year. CII data puts direct field rework at around 5% of project cost on average, and higher on heavy industrial work.

  • Monday · 08:45

    Nobody updated the P&ID after the last three MOCs.

    The HAZOP is next week, on drawings that describe a plant that no longer exists. In one published process-safety case, inspectors found 21 systems missing from the P&IDs and 10 drawn items that were never installed.

    What it costsHazard studies done on fiction, and a finding waiting to happen.

  • Wednesday · 09:10

    Half the morning finding the right revision.

    Rev C is in the document system, Rev E is on the project share, and the one that matches the plant is a marked-up print in the planner's drawer.

    What it costsEngineering hours, and wrong-revision mistakes that surface on site.

  • Thursday · 06:00

    Send a team to measure up before we can quote.

    Permits, a ladder, a tape and a notebook, across a congested pipe rack in the heat. In one scanner maker's power-plant case, a tape survey was estimated at six people for three weeks; scanning took two people three days.

    What it costsWeeks of site time, permits and travel, before the design can even start.

  • Sunday · 14:30

    The new rack clashes with a cable tray nobody drew.

    Day three of the shutdown. The tray went in during 2017, under an MOC that never reached the drawings. Now the steel is up, the tray is in the way and the electrical contractor is not on site.

    What it costsRedesign in the field. Engineering and review errors drove about 62% of rework cost in one study of 108 incidents.

  • Friday · 15:00

    Forty boxes and a USB stick.

    The EPC has handed over. Data sheets, certificates and drawings, in mixed formats, with no model and no index. The next project will survey the same area again.

    What it costsOperations starts life with an information gap.

What we take off your plate

The truth about your plant, in formats your engineers use.

We scan, register, model and check, then keep the record current. You receive what the decision in front of you needs, not a whole-plant model nobody asked for.

  • Registered point cloud E57 · LAZ

    The scoped area, registered to site control, with an accuracy statement you can hold us to.

  • 360° walk-through in a browser

    Navigable imagery tied to the cloud, so planners, SHE officers and contractors can look and measure without a site visit or a CAD licence.

  • As-built 3D model

    As IFC and DWG, ready for Revit or AutoCAD, at the level of detail the job needs, for the scope that needs it.

  • Updated drawings

    General arrangements, piping isometrics, structural and layout drawings, and P&ID mark-ups for your process engineers to verify.

  • Clash and fit-up report

    New design checked against the as-is scan, with tie-in coordinates and fit-up dimensions issued before fabrication.

  • Deviation report

    Every place your existing drawings disagree with the scan, ranked by consequence rather than listed by page.

  • Handover index

    Model, drawings, data sheets and certificates linked to asset tags, and searchable by question rather than folder.

  • Kept current

    A re-scan and model update after each MOC or shutdown, so the twin is still true next year.

How it gets done

From scan to a checked tie-in, week by week.

Scanners and drones capture the plant. AI does the sorting and the first comparison. Our surveyors and engineers own the accuracy, and nothing is fabricated until you have reviewed the fit.

  1. Day 0Scope

    Start from the decision, not the plant.

    A tie-in, a revamp, a handover or an MHI study? We agree the area, the accuracy and the level of detail that decision needs. You approve the scope.

    • Engineer
    • You approve
  2. Day 0Gather

    AI reads what you already hold.

    Existing drawings, P&IDs, MOCs and data sheets are read and indexed, and a tag list is built, so the scan has something to be compared against.

    • AI indexes
  3. Days 1–3Capture

    The plant, captured as it stands.

    A mobile scanner through congested areas, a terrestrial scanner where tie-ins need the highest accuracy, drone capture for structures and roofs. Under your permit to work, usually with the plant running.

    • Scanners and drones
    • Surveyor
  4. Week 1Register

    Registered, checked, and in your browser.

    Scans are registered to site control and checked for accuracy by our surveyor. AI classifies pipe, steel and equipment to speed up modelling. The point cloud and 360° view go live for your team within the week.

    • Surveyor checks
    • AI classifies
  5. Weeks 2–4Model

    Modelled to the detail the job needs.

    Our engineers and drafters build the model, ready for AutoCAD or Revit. AI flags every place where the old drawings and the scan disagree, and the engineer decides which ones matter.

    • Engineers and drafters
    • AI flags deviations
  6. Before fabricationClash

    The new design meets the real plant.

    Every new spool, rack and beam checked against the as-is scan. Tie-in coordinates and fit-up dimensions issued for the fabricator.

    • Engineer
  7. ReviewYour call

    You approve before anything is cut.

    Your engineer reviews the model, the deviation report and the clash report. Fabrication starts on your approval, not ours.

    • You approve
  8. After each MOCKeep it true

    A twin that is still true next year.

    Handed over with an index, then re-scanned and updated after each change or shutdown, so the next project starts from fact instead of another survey.

    • Re-scan
    • Engineer updates

What the weeks depend on. The size of the area and the level of detail set the modelling time, and we quote both before we start. Hot surfaces, vibration and moving plant are planned for, but some areas can only be scanned in a shutdown window. Every deliverable states its accuracy, so nobody fabricates to a tolerance we didn't measure.

The old way, and with Kuumba

Measure once. Fit the first time.

How as-built information is handled the usual way compared with Kuumba
Area The old way With Kuumba
Measure-upWeeks with a tape, a ladder and a notebookDays of scanning, the whole area at once
Tie-insDiscovered at fit-up, during the shutdownChecked against the scan before steel is cut
DrawingsThree revisions, none quite trueDeviations from the scan found and ranked by consequence
Who can see the plantWhoever can get a permit and a site visitAnyone with the link, in a browser, measuring as they look
Hazard studiesRun on drawings that predate the last MOCsRun on a record checked against the plant
HandoverBoxes, a USB stick and no indexModel, drawings and data linked to tags and searchable
After the next changeOut of date againRe-scanned and updated after each MOC

Where AI helps, where people decide

AI sorts the millions of points. Engineers own the millimetres.

AI does

The reading, sorting and comparing.

  • Reads and indexes your drawings, P&IDs, MOCs and data sheets.
  • Classifies pipe, steel and equipment in the point cloud to speed modelling.
  • Flags every place where a drawing and the scan disagree.
  • Links documents to asset tags, so the handover can be questioned.
  • Answers "which data sheet is this valve?" with the source attached.

People decide

Accuracy, design and what gets built.

  • The scope, accuracy and level of detail the decision needs.
  • Registration and the accuracy statement, checked by a surveyor.
  • Which deviations matter, and what the model shows.
  • Every tie-in dimension issued to a fabricator.
  • Approval to fabricate: yours.

Stacks, roofs and structures are captured from the air, so nobody climbs to measure: see Robotics & Drones.

Standards we work to

An as-built record the regulations can rely on.

Risk assessments, hazard studies and modifications all assume the description of the plant is true. We build the record those duties depend on, in the formats your engineers already deliver in.

  • OHS Act 85 of 1993And the regulations made under it
  • Construction Regulations 2014Reg 5 client duties · Reg 6 designer duties
  • Major Hazard Installation RegulationsReg 10 risk assessment, on an accurate description
  • Pressure Equipment Regulations 2009Modifications, repairs and the as-built record
  • MHSA 29 of 1996Surveying, mapping and mine plans
  • Geomatics Profession Act 19 of 2013SAGC registration where survey work is reserved
  • ISO 19650-1 · -2 · -3Information management, delivery and operational phases
  • ASTM E2807E57 point cloud exchange format
  • IEC 81346Reference designation for asset tags
  • ISO 23247Digital twin framework for manufacturing, where it fits

Questions engineers ask

The questions we hear first.

Is it a digital twin, or just a 3D model?

Honestly, it starts as an accurate as-built model linked to your documents and asset tags, and that alone settles most brownfield arguments. Live sensor data is a later step, added only where it pays for itself.

What makes it a twin rather than a snapshot is that it is kept current after every change.

Do we need a model of the whole plant?

Rarely. We model what the decision needs: the tie-in area, the revamp, the rack. The point cloud covers everything else at a fraction of the cost, and can be modelled later if a new job needs it.

How accurate is it?

Terrestrial scanning resolves millimetres over tens of metres. Mobile scanning is much faster and somewhat less precise. We choose per area, using the terrestrial scanner where a tie-in has to fit, and we state the accuracy on every deliverable.

Can you scan while the plant is running?

Usually, under your permit to work. Hot surfaces, vibration and moving equipment are planned for in the method statement. Some areas, such as inside vessels or behind guarding, need a shutdown window, and we tell you which in the scope.

What software do we need to use it?

None to look. The point cloud and 360° imagery open in a browser. Models and drawings come as IFC, DWG/DXF and PDF, ready for AutoCAD or Revit, the tools your engineers and contractors already work in, with native files on request. Point clouds come in open E57 and LAZ.

Who keeps it up to date after we've handed over?

We can: a re-scan and update after each MOC or shutdown is part of the service. Or we train your team to do it and check their work. Either way, a twin that isn't updated becomes another out-of-date drawing, and we will say so.