Planned work, actually done.
Our planners and reliability engineers take on your backlog, weekly schedule, work packs, shutdowns and statutory registers. AI does the cleaning and drafting from your CMMS exports, your supervisors decide what gets done, and your artisans or our vetted partners arrive at jobs that are ready to start.
-
Work packs
3×faster
Drafted in under an hour from your history and procedures, instead of a planner’s two to four hours. A planner checks every one.
-
Backlog you can trust
4weeks to a ranked backlog
Cleansed, de-duplicated and ranked by risk for a typical plant, from your CMMS exports.
-
Statutory inspections
1register for every due date
Pressure vessels, lifting machinery, CoCs and IA certificates, instead of one person’s spreadsheet.
The week you know
The schedule lasts until the first breakdown.
Maintenance has become a national lever. Transnet's maintenance backlog is estimated at more than R30 billion, while Eskom's unplanned losses fell from about 27% to about 17% in a year of sustained maintenance. On your plant, it starts with a Monday meeting.
-
Monday · 06:30
1,400 open notifications, and nobody believes them.
Half are duplicates and a third are more than a year old. The planning meeting argues about the report instead of the work.
What it costsPlanning on fiction, with real risk hidden among the ghosts.
-
Tuesday · 09:00
PM compliance is green. The PMs weren't all done.
Some were closed without the work. Others were deferred until they dropped off the report. The dashboard is calm; the plant is not.
What it costsHidden risk behind a good number. SMRP puts best-in-class PM compliance at 90%, and the figure only means something once the on-time window is fixed.
-
Wednesday · 14:00
The primary crusher trips.
By five past two the week's schedule is gone. The PM crew moves to the breakdown, and next week's PMs slide to make room.
What it costsLost throughput, and the next breakdown made more likely. Siemens estimates unplanned downtime costs the world's 500 largest companies about 11% of their revenue.
-
Thursday · 10:30
Failure code: "broken". Remarks: "fixed".
The reliability engineer is asked for a root-cause analysis on the pump that keeps failing. The history has nothing in it to analyse.
What it costsThe same failure, repaired again and again, because nothing was learned the first time.
-
Friday · 16:00
Shutdown in six weeks, and the scope is still growing.
Work packs aren't ready. Permits, isolations and scaffolding live in three spreadsheets owned by three people.
What it costsOverrun. In a database of more than 1,350 turnarounds, over two-thirds overran cost or schedule by 10% or more, or tripped after start-up.
-
Monday · 07:15
The fitter who knows that gearbox retires next year.
What he knows isn't written anywhere, and the artisans who could replace him are getting harder to find.
What it costsCapability walking out of the gate. The share of South African companies struggling to recruit artisans rose from 10% in 2024 to 22% in 2025.
What we take off your plate
Planning, reliability, and the registers in between.
We start with an honest baseline, then take the planning load off your supervisors week by week. Your CMMS stays your system of record: we work from its exports, and agreed changes go back in through a person.
-
A baseline in the first weeks
Backlog health, PM compliance with the window stated, the planned and reactive split, schedule compliance, the top bad actors and a data-quality score.
-
Backlog cleanse
Duplicates merged, obsolete work closed with a reason, and every open job ranked by risk and by whether it is ready to schedule.
-
Weekly schedule
Built from the ranked, ready backlog, with parts and people confirmed and a daily review of break-in work.
-
Work packs
Job steps, isolations, permits, spares and tools, drawings, and the safety notes from the risk assessment, so the crew spends the shift on the tools rather than at the stores counter.
-
PM optimisation
Duplicate and low-value PMs removed, and intervals aligned with your failure history and the OEM's guidance.
-
Failure data and RCA ISO 14224
Failure coding your engineers can analyse, a monthly defect-elimination report, and root-cause analyses on the bad actors.
-
Shutdown planning
Scope challenge and freeze, work packs, a critical path agreed with your contractors, the permits and isolations register, and daily progress.
-
Statutory-inspection register PER 2009 · DMR 2015
Pressure vessels, lifting machinery, electrical CoCs and IA certificates, with due dates in front of the people who act on them.
-
Knowledge capture
Interviews and photo walk-throughs with your senior artisans, turned into job instructions they review and sign off as right.
-
Monthly operations report
KPIs against the baseline, the trends behind them, and next month's risks, drafted for your review.
How it gets done
A baseline first. Then better every week.
AI cleans, ranks and drafts. Planners and reliability engineers decide. You approve the schedule, and your artisans or our vetted partners do the work with the work packs ready.
-
Weeks 1–2Baseline
We measure before we promise.
A planner and a reliability engineer interview your team and walk the plant. Kuumba Work reads your CMMS exports, work orders, notifications and PMs in Excel or CSV, finds duplicates, stale jobs and junk codes, and drafts the baseline report. You approve the baseline and how each KPI is defined.
- Planner and reliability engineer
- AI reads the exports
-
Weeks 2–4Cleanse
Every merge and closure, decided by a person.
AI proposes merges and closures with a reason for each, ranked by criticality and age. Our planner decides every one with your supervisors, and approved changes are keyed back into your CMMS by your team or ours.
- AI proposes
- Planner decides
-
Every weekPlan
Work packs drafted, parts and people confirmed.
AI drafts work packs from history, procedures and drawings, and checks stock and open POs in SAP Business One where you run it, read-only. Our planner builds the schedule and confirms who and what will be at each job.
- AI drafts packs
- Planner
-
Every FridayApprove
You approve next week's schedule.
A one-page view of what is planned, what is ready, and what is waiting on parts or permits. Nothing is scheduled that you haven't seen.
- You approve
-
Every dayExecute
Your artisans or our partners do the work. The history writes itself.
Supervisors and artisans close jobs on a phone, with photographs, in the Ops app. AI turns each close-out into structured history, so next month's RCA has something to work with.
- Your artisans or partners
- AI records
-
Every monthImprove
Bad actors found, PMs earned.
Our reliability engineer runs RCAs on the worst offenders and reviews the PM programme. AI drafts the monthly report and the defect Pareto. You approve every PM change and every RCA action.
- Reliability engineer
- AI drafts
- You approve
-
ShutdownPlan and run
Scope frozen, packs ready, progress daily.
Our shutdown planner leads the scope challenge and freeze. AI assembles the work packs and the permits and isolations register and reports progress every day. You approve the freeze, and every change after it.
- Shutdown planner
- AI assembles
- You approve
Where our software stops. Kuumba Work does not connect to your CMMS. We work from its exports, and every agreed change goes back in through a person, yours or ours. Automatic reminders for statutory certificates are still being built; until then the register is a live table your team can filter, and a weekly report.
The old way, and with Kuumba
Same crews. A schedule that holds.
| Area | The old way | With Kuumba |
|---|---|---|
| Backlog | Duplicates and ghosts nobody has time to clear | Cleansed and ranked within four weeks for a typical plant |
| PM compliance | "Green", with the window undefined | Measured to SMRP 5.4.14, window stated, trend reported monthly |
| Work packs | Hours per pack, and often not ready | Drafted in under an hour from history and procedures; a planner checks each one |
| Planned work | Reactive-heavy, the schedule broken by Wednesday | A planned share that rises month on month against the baseline |
| Failure history | "Broken", "fixed" | Coded so a root-cause analysis has something to work with |
| Statutory inspections | Due dates in one person's spreadsheet | Every pressure vessel, lifting machine and CoC in one register |
| Monthly report | Rebuilt by hand | Draft ready on the first working day of the month |
Where AI helps, where people decide
AI clears the desk. People decide what gets done.
AI does
The cleaning, ranking and drafting.
- Reads CMMS exports and finds duplicates, stale jobs and junk failure codes.
- Proposes merges and closures, ranked by criticality and age.
- Drafts work packs and job instructions from history, procedures and drawings.
- Turns job close-outs and photographs into structured history.
- Checks stock and open POs in SAP Business One, read-only, where you run it.
People decide
What gets done, when, and whether it was done right.
- Risk ranking and asset criticality.
- Every closure keyed back into your CMMS.
- Isolations and permits, issued by your authorised people.
- Every PM change and every RCA conclusion.
- Shutdown scope, and every change after the freeze.
Artisans do the work and competent persons sign it off. Where an asset needs eyes at height or in a confined space first, see Robotics & Drones.
Standards we work to
Planned to the regulations your inspector carries.
Statutory inspections, risk assessment and asset management, named where they apply, so an auditor can follow the thread from the register to the law.
- MHSA 29 of 1996Section 11 risk assessment; Chapter 8 machinery
- OHS Act 85 of 1993Section 8 employer duties
- Driven Machinery Regulations 2015Lifting machinery inspected by a registered LMI
- Pressure Equipment Regulations 2009In-service inspection at most every 36 months
- Electrical Installation Regulations 2009Certificate of Compliance after alterations
- Construction Regulations 2014Shutdown work that is construction work
- ISO 55001:2024Asset management systems
- ISO 14224Failure data collection and coding
- SMRP Best PracticesPM compliance (5.4.14) and maintenance metrics
- EN 13306Maintenance terminology
- SAE JA1011Reliability-centred maintenance criteria
- MHS Amendment Bill 2024A bill, not yet law; we track every change
Questions planners ask
The questions we hear first.
Does Kuumba Work connect to our CMMS?
Not today, and that includes SAP Plant Maintenance. We work from exports, in Excel or CSV, and agreed changes go back into your CMMS through your team or ours.
A direct connection is not in our product yet, and we won't pretend otherwise.
Who does the hands-on work?
Your artisans, or vetted partners we bring in for the trades and the peaks. We plan, schedule and track the work, and one team answers to you for the plan and the record.
Whoever turns the spanner arrives at a job that is planned, packed and safe to start.
Will you guarantee 90% PM compliance?
No. We measure it to the SMRP definition from the first weeks, with the on-time window stated, and we commit to the plan that moves it.
A guarantee only makes sense in an outcome agreement written after there is a baseline to hold it against.
How do you handle permits and isolations?
Your permit-to-work and lockout procedures stay in charge. We prepare the isolation lists and permit requirements in each work pack, and your authorised people issue them.
What about our senior artisans' knowledge?
We record it through interviews, photo walk-throughs and job instructions that they review and correct, so it stays on the plant when they retire.
Can you plan our shutdown?
Yes: scope challenge and freeze, work packs, the contractor schedule, the permits and isolations register, and daily progress reporting.
You approve the freeze and every change after it.