The part is there before the shutdown is.
We clean the requisitions, compare the quotes, chase every long-lead order and kit every work pack, reading SAP Business One so nothing is assumed. Your authorised buyer still approves the award and releases every purchase order.
-
Quote comparison
4×faster
A day of spreadsheet work becomes two hours of review: one currency, one Incoterm, one scope, every deviation listed.
-
Shutdown kitting
100%of parts tracked daily
Status per work order, every day for the last two weeks before the shutdown.
-
Long-lead orders
Weeklynot when late
Drawing approval, factory slot, FAT, shipping and port, checked order by order.
The week you know
A missing part is decided weeks before it's missed.
A requisition bounces. A quote waits in a spreadsheet. A long-lead order goes unchased. Nobody notices until the first morning of the shutdown, when the gasket kit turns out to be in Durban.
-
Monday · 08:20
The requisition that bounced three times.
No part number, the wrong cost centre, no datasheet. The buyer sends it back, the engineer is on site, and two weeks pass before an RFQ goes out.
What it costsA lead time that starts late, on an order that was always going to be tight.
-
Tuesday · 22:00
Three quotes, three formats.
One supplier quotes ex-works Johannesburg, one delivered to site, one in euros with a sixteen-week lead and a different valve trim. The comparison gets built by hand, late, in a spreadsheet.
What it costsA day of a buyer's or an engineer's time, and a “cheapest” supplier that wasn't.
-
Wednesday · 10:40
The transformer nobody chased.
The PO went out in March. Nobody asked for the manufacturing schedule, the drawing approval came back late, and the factory slot moved. Some lead times run to months: in 2020, valve spares that normally took six to eight weeks were taking up to thirty.
What it costsA date in the programme that was never real.
-
Thursday · 11:00
The certificate expired last month.
The preferred supplier's B-BBEE certificate lapsed in September. The award went out in October. Nobody checked the date.
What it costsProcurement recognition you were counting on, gone from the scorecard and the Mining Charter report.
-
Friday · 15:45
Stock says four. The bin says none.
SAP Business One shows four bearings in the main store. Two went out to a job without a goods issue. The other two are the wrong bore.
What it costsAn emergency buy, premium freight, and a planner who stops trusting the system.
-
Shutdown, day 1 · 05:30
The gasket kit is in Durban.
The work pack says “on order”. The reality is a container at the port, a supplier waiting on a deposit, or an order never placed. A study of turnaround delays at an Engen refinery names procurement among the main causes.
What it costsOn a large refinery turnaround, US estimates put each extra day at millions of dollars in lost margin.
What we take off your plate
Everything your buyer needs to say yes.
We prepare, compare, check and chase. Your authorised buyer approves the award and releases the purchase order in SAP Business One, under your delegation of authority. Nothing is ordered in your name without them.
-
Clean requisitions
Descriptions, part numbers, datasheets, cost codes and need-by dates complete, and checked against stock in SAP Business One before an RFQ goes out.
-
RFQ packs
Sent to your approved supplier list, with the technical and commercial requirements stated once and late quotes chased, not waited for.
-
Quote comparison Incoterms 2020
Normalised to one currency, one delivery term and one scope, with technical deviations, lead times and B-BBEE status side by side, and a recommendation with its reasons.
-
Supplier compliance check
B-BBEE certificate validity and level, CSD and tax status for public work, and local-content declarations wherever your tender or mining right asks for them.
-
Long-lead and expediting register
Every critical order with drawing approval, manufacturing milestones, FAT, shipping and port status, updated from the supplier every week, not from hope.
-
Shutdown kitting report
Every work order's parts, marked in stock, on order, at port, received or kitted, issued weeks ahead and daily for the last fortnight.
-
GRN and invoice follow-up
Received but not booked, booked but not invoiced, invoices blocked on the three-way match: listed, owned and cleared, so suppliers stay paid and on side.
-
Monthly procurement report
Cycle times, spend by B-BBEE level, preferential procurement and Mining Charter figures, and supplier performance on time and quality.
-
Your buyer releases every PO
We source, compare and expedite. Your authorised buyer releases the order, with every check already done.
How it gets done
From requisition to kitted work pack.
AI reads SAP Business One and does the comparing and reconciling. Our buyers and expediters work the phones and walk the factory floor. The award and the purchase order stay yours.
-
Week 1Set-up
We learn your rules, and read your system.
Our procurement lead agrees the approved supplier list, delegation of authority, B-BBEE and local-content rules, and the critical-spares list with you. Kuumba Work reads SAP Business One, read-only: open requisitions, orders, goods receipts and stock by warehouse.
- Procurement lead
- AI reads SAP Business One
- You set the rules
-
Each PRClean-up
Requisitions checked before they bounce.
Each requisition is checked for missing data, duplicates and stock already on hand. If something is missing, the requester gets one specific question the same day, not a form sent back.
- AI checks
- Buyer
-
Each RFQOut to market
RFQs out, quotes chased.
The RFQ pack is drafted from the requisition and datasheets, and our buyer sends it to your approved suppliers. Late quotes are followed up, not waited for.
- AI drafts
- Buyer
-
Quotes inCompare
One table, like for like.
Quotes are normalised for currency, Incoterm, scope and lead time, and every B-BBEE certificate is checked for date and level. Our buyer and engineer review the technical deviations and write the recommendation.
- AI normalises
- Buyer and engineer
-
AwardYour release
Your buyer approves, and releases the PO.
The recommendation reaches your authorised buyer with every quote and check behind it. They approve the award and release the purchase order in SAP Business One, under your delegation of authority.
- Your buyer releases
-
WeeklyExpedite
Every long-lead order, every week.
Our expediters call and visit suppliers. AI holds the milestone register, drafts the status requests, reads the replies and flags any slip that hits a need-by date or the shutdown. Recovery, whether air freight or an alternate supplier, is yours to approve.
- Expediter
- AI tracks
- You decide recovery
-
Last 2 weeksKitting
Every part, every work pack, every day.
Each work order's parts are reconciled daily against stock, orders and receipts. Our planner and expediter walk the kitting area, because the bin has to match the system. You call go or no-go on each work pack.
- AI reconciles
- Planner and expediter
- You call go
What the two hours depend on. Two hours for a comparison start when the last quote arrives, from a complete requisition. Supplier response times and your approval chain run on their own clocks. And the kitting report is only as true as the bins: where they don't match the system, we send someone to count.
The old way, and with Kuumba
Same suppliers. No surprises at the gate.
| Area | The old way | With Kuumba |
|---|---|---|
| Requisitions | Bounced back until someone fills the gaps | Checked on arrival, with one specific question to the requester |
| Quote comparison | A day in a spreadsheet, in three currencies | Two hours of review on a like-for-like table |
| B-BBEE certificates | Checked when the auditor asks | Date and level checked at every comparison |
| Long-lead orders | Chased once they're already late | Milestones confirmed with the supplier every week |
| Stock | Trusted until the bin is empty | Reconciled against SAP Business One, and counted when it doesn't add up |
| Shutdown readiness | “On order” in the work pack | Status on every part, daily for the last two weeks |
| Who releases the PO | Your buyer, after doing all of the above alone | Your buyer, with all of the above already done |
Where AI helps, where people decide
AI does the chasing. People spend the money.
AI does
The comparing, reconciling and follow-up.
- Checks requisitions for missing data, duplicates and stock already on hand.
- Drafts RFQ packs, and the follow-ups for late quotes.
- Normalises quotes for currency, Incoterm, scope and lead time.
- Checks B-BBEE certificate dates and levels at every comparison.
- Reconciles stock, orders, goods receipts and invoices in SAP Business One, read-only.
People decide
The supplier, the award and the commitment.
- Which supplier wins, and why.
- Every award and PO, approved and released by your authorised buyer.
- Escalations, substitutions and recovery plans.
- The phone call, and the visit to the factory floor.
- Go or no-go on every shutdown work pack.
AI never places, approves or releases an order. Our connection to SAP Business One is read-only.
Standards we work to
Bought to the rules you report against.
Every comparison shows the certificate, level and declaration behind it, so your preferential procurement figures hold up when someone checks them.
- PPPFA 5 of 2000Preferential procurement framework
- Preferential Procurement Regulations 202280/20 up to R50 million, 90/10 above
- B-BBEE Act 53 of 2003Codes of Good Practice; procurement recognition
- Mining Charter 2018Local goods and services, as written into your mining right
- CIDB Standard for UniformitySupply contracts for public work
- NEC3 Supply ContractCommon on state-owned company projects
- Incoterms 2020Delivery terms, normalised on every quote
- Public Procurement Act 28 of 2024Assented, not yet in force; we track commencement
Questions buyers ask
The questions we hear first.
Will your AI place orders in our SAP Business One?
Your authorised buyer places them. Our connection to SAP Business One is read-only: we prepare the award with every quote and check behind it, and your buyer approves it and releases the PO under your delegation of authority.
How do you handle B-BBEE and local content?
We check certificate validity and level at quote stage, and keep a monthly view of spend by level.
Local-content rules for public work changed in 2022, and the Public Procurement Act is not yet in force. So we follow what your tender or mining right actually requires, and tell you plainly when a rule is unclear.
Can you tell me what's missing for the shutdown?
Yes, from your own data: every work order's parts against stock, orders and receipts, with the gaps listed by need date.
Accuracy depends on the bins matching the system. Where they don't, we send someone to count.
Do you replace our buyers?
No. We take the chasing, comparing and reconciling off them, so they can negotiate and manage suppliers.
What about suppliers who only answer on WhatsApp?
Many do. Our expediters handle it and log every reply against the order. A direct WhatsApp channel in Kuumba Work is planned, not live.
Can you show us our real requisition-to-PO times?
Yes, from the document dates in SAP Business One, once we can read them. It is usually the first surprise.


