Know the final cost while you can still change it.

Our cost engineers run your monthly cycle: the cost report, forecast to complete, earned value, cash flow and variations. AI does the stitching across SAP Business One, Excel, Primavera P6 exports and the PDFs in your inbox, and nothing reaches your client or your board until you approve it.

  • Monthly cost report

    3×faster

    A reviewed draft one working day after cut-off, instead of three days spent stitching exports together.

  • Forecast to complete

    4×more often

    Refreshed every week instead of once a month, with earned value and trend side by side.

  • Variations

    2working days to a priced draft

    Logged the day the instruction arrives, with its notice date, and valued from your contract rates.

Rows of solar panels stretching across red Kalahari scrub near Upington, seen from a moving car at dusk
Upington, Northern Cape

The week you know

The numbers arrive after the decisions.

McKinsey found that 98% of megaprojects overrun their cost by more than 30%, and 77% are at least 40% late. Rarely because nobody was counting. Usually because the count came too late to change anything.

  • Wednesday · 07:40

    Two days of stitching before the first real number.

    Actuals sit in SAP Business One, commitments in an Excel PO register, progress in a P6 export, and subcontractor valuations in PDFs across three inboxes. The report is due to the client on Friday.

    What it costsYour most senior controller, spending the cycle on copy and paste instead of the forecast.

  • Thursday · 10:15

    The forecast is last month's, plus a feeling.

    The estimate at completion moves only when someone has time to move it. Site knows the conveyor package is in trouble. The report won't say so for another two cycles.

    What it costsIn a study of 35 industrial projects, cost-based forecasts often settled only after the work was 80% complete. By then an overrun is a fact, not a warning.

  • Tuesday · 16:30

    A site instruction, and a clock nobody started.

    The instruction arrived on WhatsApp. By the time it is measured, priced and written up, half the notice window has gone, and the letter still needs a signature.

    What it costsA claim lost to a time bar. FIDIC 2017 allows 28 days to notify a claim; NEC4 allows eight weeks for a compensation event.

  • Monday · 08:00

    EXCO sits on the 14th. The pack isn't close.

    The CAPEX motivation needs quotes, a cash flow, an NPV, a risk register and a procurement strategy, rebuilt in this year's template. Miss the date and the project waits for the next sitting.

    What it costsA month of slip, decided by a document rather than by the project.

  • Friday · 15:00

    Forty tabs, and one person who understands them.

    The cost model has grown for three years. Only one person knows which cells are hard-coded and which links still work, and she is on leave next month.

    What it costsKey-person risk, and formula errors nobody can see. Audits of real-world spreadsheets keep finding significant errors in most of the ones they check.

  • Tuesday · 11:20

    A simple question, and half a day to answer it.

    The client asks what is spent and what is committed on one package. You pull POs, find GRNs that were never captured, and the actuals still look too low to be true.

    What it costsFalse comfort until the unaccrued cost lands at once. One industry survey found construction professionals spend 5.5 hours a week just looking for project data.

What we take off your plate

The monthly cycle, run for you and ready for your signature.

Project finance, as we mean it, is project controls and commercial management: what the job has cost, what it will cost, and what it is owed. We work to your cost breakdown structure, your contract and your template, and you receive packs your commercial team can defend line by line.

  • Monthly cost report pack

    Budget, commitments, actuals, accruals, forecast to complete and EAC per cost code, with a variance commentary drafted for your review. Excel workbook and PDF.

  • Earned value reporting ISO 21508

    Planned value, earned value and actual cost, CPI and SPI, and the EAC methods compared side by side, built from your Primavera P6 export and cost data.

  • Cash-flow forecast

    An S-curve and the monthly cash requirement, refreshed with every update rather than once a quarter.

  • Variation and claims register FIDIC · NEC · JBCC · GCC

    Every instruction logged the day it arrives, with its notice date. Every variation valued from the rates and quantities in your contract, with backing sheets.

  • Change control log

    Trends, early warnings and contingency drawdown, tied back to the risk register so every movement has a reason.

  • CAPEX motivation packs

    Business case, cost estimate with a stated accuracy class, cash flow, NPV and IRR, and the risks, in your template for EXCO, the investment committee or the gate review.

  • Subcontractor valuations and payment certificates

    Checked against measured progress and contract rates before anything is certified for payment.

  • Close-out and final account

    The final account reconciled, and the project's real cost data captured so the next estimate starts from what happened, not from what was hoped.

How it gets done

From cut-off to a draft you can challenge.

AI does the gathering, matching and first draft. Our cost engineers spend the cycle on what the numbers mean, your controller sets the forecast, and you approve before anything goes out.

  1. Week 0Set-up

    We agree the structure once.

    You share the control budget workbook, the contract and rate schedules, and the P6 baseline. Our cost engineer agrees the cost breakdown structure, cut-off dates, report template and authority matrix with you, and maps every cost code.

    • Cost engineer
    • You approve the baseline
  2. Cut-offGather

    The data comes to us. Nobody chases you.

    Kuumba Work reads actuals, POs, GRNs and supplier ageing from SAP Business One, read-only and with your permissions, alongside the P6 export, subcontractor valuations and invoices. POs without a GRN are flagged as accrual candidates.

    • AI gathers
    • Cost engineer
  3. Day 1Reconcile

    A draft report, with every figure traced.

    AI builds the draft cost report and earned value tables in Excel, with a first variance commentary. Each figure links back to the row it came from. Our cost engineer works through every mismatch and calls site where the numbers don't tie.

    • AI drafts
    • Cost engineer reviews
  4. Day 1–2Forecast

    The controller sets the forecast.

    AI proposes a forecast to complete for each cost code from trend, CPI and earned schedule, and shows how far the methods disagree. Your controller decides the number, using what only site knowledge can tell.

    • AI proposes
    • Controller decides
  5. Day 2Challenge

    A commercial lead pulls it apart.

    Before you see it, our commercial lead challenges the draft, the commentary and the forecast, then signs it off internally. The pack is generated in your template as Excel, Word and PDF.

    • Commercial lead
  6. Day 2Issued

    You approve, and the report goes out.

    You read the summary of what moved and why, then approve. The pack goes to your client, owner or board. Nothing is sent before that.

    • You approve
  7. Any dayChanges

    Variations and CAPEX packs, between cycles.

    A new instruction is logged the day it arrives, with its notice date in the register. Our QS confirms entitlement and the notice route, AI drafts the valuation from contract rates, and you approve before it is submitted. CAPEX packs follow the same path into your template.

    • QS
    • AI values
    • You approve

What the day depends on. The clock starts at cut-off, with your exports in hand. Clean exports make it a day; the first month is usually slower, and we tell you why. Your control budget comes from your own workbook, not from SAP Business One, and other ERPs come in as Excel, CSV or PDF exports. Notice dates live in the register and the report: automatic alerts are still being built.

The old way, and with Kuumba

Same contract. A different month end.

How project controls are handled the usual way compared with Kuumba
Area The old way With Kuumba
Draft cost reportDays of stitching across systems and inboxesOne working day after cut-off, from clean exports
Forecast to completeLast month's number, moved when there's timeRefreshed weekly, with the spread between methods in view
VariationsPriced when someone is free, sometimes after the notice windowLogged on arrival with the notice date; a priced draft within 2 working days
AccrualsMissing GRNs make actuals look comfortably lowPOs without a GRN flagged as accrual candidates every cycle
CAPEX packsRebuilt from scratch for every committeeAssembled in your template in 3 to 5 working days
EvidenceNumbers whose source lives in one person's headEvery figure traced to the row it came from
Who decidesWhoever built the spreadsheetYour controller sets the forecast; you approve what goes out

Where AI helps, where people decide

AI does the arithmetic. People own the position.

AI does

The gathering, matching and first draft.

  • Reads actuals, POs, GRNs and supplier ageing from SAP Business One, read-only, with your permissions.
  • Reads subcontractor valuations, invoices, Excel registers and Primavera P6 exports.
  • Flags accrual candidates and figures that don't tie.
  • Computes earned value and compares the EAC methods.
  • Drafts commentary, packs and valuations, each figure traced to its source.

People decide

The forecast, the entitlement and what the client is told.

  • The forecast to complete for every cost code.
  • Entitlement under the contract, and the commercial position on each variation.
  • Which risks draw down contingency, and when.
  • What the commentary says, and how it is said.
  • Every number that leaves the building.

AI never changes a figure in your ERP. The SAP Business One connection is read-only by design, and nothing is sent without a person's approval.

Standards we work to

Built to the contract you signed and the rules you report under.

Notice clocks follow the clauses in your contract. Earned value follows the standard. Public owners get the stage gates and reporting Treasury expects.

  • PFMA 1 of 1999Public entities and Treasury Regulations
  • MFMA 56 of 2003Municipal capital projects
  • FIDPM / IDMSNational Treasury stage gates for infrastructure
  • CIDB Act 38 of 2000Standard for Uniformity in Construction Procurement
  • FIDIC 2017Sub-Clause 20.2 claim notices
  • NEC3 / NEC4Early warnings and compensation events
  • JBCC PBA · GCC 2015Variations and payment certificates
  • ISO 21508:2018Earned value management
  • ANSI/EIA-748Earned value system discipline
  • AACE InternationalEstimate classification practice
  • IFRS 15 · IAS 16Contract revenue and capitalised CAPEX
  • POPIAPersonal data in labour and payroll costs
  • ISO/DIS 21508Revision in progress; we track every change

Questions controllers ask

The questions we hear first.

Do you raise project finance, as in debt or equity?

No. Here, project finance means project controls and commercial management: knowing what the project has cost, what it will cost and what it is owed, early enough to act.

Raising funding is work for your bankers and funders. The cost reports, cash flows and CAPEX packs we build are the numbers they will ask to see.

Do you replace our cost engineer?

No. We take the stitching off their desk, so they spend the cycle on the forecast and the commercial position instead of on copy and paste.

Where you have no controls team, ours runs the cycle and your project manager approves it.

Our ERP isn't SAP Business One. Does this still work?

Yes, through exports. Excel, CSV and PDF from any ERP work. A live, read-only connection is in place for SAP Business One today; other systems come in as files at each cut-off.

Can the AI change numbers in our ERP?

No. The SAP Business One connection is read-only by design, and it reads with each person's own permissions. Nothing is sent, submitted or posted without a person approving it first.

How do we know a figure is right?

Every figure in a draft is traced back to the source row it came from, so anyone can follow it. A Kuumba cost engineer reviews the pack and a commercial lead challenges it before you see it. You approve the final version.

Which contracts do you work with?

JBCC, NEC3 and NEC4, FIDIC and GCC 2015. The variation clock follows the clauses and the edition in your contract, and the register names the clause behind every notice date.